EESA proposes a series of multimodal projects:

Map ID Road Location of Improvement Existing Condition Proposed Improvements Origin of Proposed Improvement
Tualatin-Sherwood Hybrid
1 Tualatin-Sherwood Road 99 to I-5 3-5 lanes Limited access, 5-7 lanes Project Team


Tualatin-Sherwood Road 99W to Teton Avenue 3-5 lanes Widen to 5 lanes with bike lanes and sidewalks RTP
  Nyberg Road Martinazzi to I-5 6 lanes Widen to 7 lanes Tualatin TSP
Other Road Improvements
2 Lower Boones Ferry Road Tualatin Road to Lower Boones Ferry Road NA New road accross Tualatin River, 2-3 lanes Tualatin TSP
3 Highway 99W Cipole to Tualatin River 4 lanes Widen to 6 lanes Tualatin TSP
4 Avery Street Avery/Tualatin Sherwood Road to Langer Drive NA New connection, 2-3 lane road Project Team/
Washington County TSP/
Tualatin TSP
5 Adams Street Tualatin Sherwood Road to Avery Street NA New connection, 2-3 lane road Project Team/
Washington County TSP/
Tualatin TSP
6 Tualatin Road Herman to Boones Ferry 2 lanes Widen to 5 lanes Tualatin TSP
7 Sagert Street Martinazzi to SW 65th 3 lanes Widen to 5 lanes Tualatin TSP
8 SW Herman Rd. From SW Cipole RD to SW Galbreath Dr. NA Extension of Galbreath or Herman, 2-3 lane road Project Team/
Washington County TSP/
Tualatin TSP
9 Roy Rogers Road Borchers to 99W 3 lanes Widen existing road to 5 lanes, improve signal timing RTP/Washington County TSP/
Sherwood TSP
10 Boones Feery Road Tualatin-Sherwood Road to Wilsonville 2-3 lanes Widen to 5 lanes with bikeways and sidewalks Tualatin TSP
11 I-5 I-5 between I-205 and Stafford interchange 6 lanes Add auxiliary lanes in both directions Project Team
12 124th Tualatin Sherwood Road to Tonquin Road NA New connection, 2-3 lane road Stakeholders
13 Day Road Boones Ferry to Grahams Ferry 2 lanes New connection, 2-3 lane road Wilsonville TSP
14 Graham's Ferry Road Day Road to Tonquin Road 2 lanes New connection, 2-3 lane road Project Team
15 Tonquin Road Grahams Ferry to new 124th Ave. 2 lanes New connection, 2-3 lane road Project Team
Multimodal Improvements
16 Commuter Rail Sherwood town center to existing line NA New connection from Sherwood to existing line RTP
17 Regional Trail System Multiple locations NA New regional trail system Metro